What Is the Timeline for Pool Installations in the Newport and Portsmouth, RI, Areas for Next Summer?

As winter settles in, you may find yourself wistfully looking ahead to next summer and considering how you can swim and lounge by the water more—and you may come to the conclusion that a backyard pool would be the answer. A pool can provide years of memories for the whole family and the most used part of your landscape. Here is how to think about the timeline for pool installations in the Newport and Portsmouth, RI, areas if you want a pool for next summer.

Related: 6 Landscape Design Ideas to Create a Relaxing Space Alongside Your Pool in the Portsmouth, RI Area

Start Planning Early

If you are wanting to have a pool installed for next summer, you will want to start considering the pool company that you plan to use. Many companies will begin to book projects several months in advance, so it is never too early to start researching the company you are interested in and make the first phone call to them. Your initial phone call may just be for you to get additional information on the company and ask any questions that you may have about the company or the process.

Consultation and Design

Once you have selected the pool company you want to use to complete the pool installation then you will have a consultation with them and begin the design process. This process can take a couple of weeks depending on when the company can come for a consultation and any changes that you and your contractor make to the initial design.

Contracts and Permitting

Once the final design is set then contracts will need to be signed and permits will need to be acquired. Permits can take time to get so this part of the process can take a week or two as long as there is nothing that will hold up the process.

The Pool Installation

From the time excavation begins to the time that your pool company will construct the concrete shell of the pool will take approximately two weeks. It will begin with the excavation of soil, then the rebar will be placed which is the steel bar cage that the gunite will be sprayed into. After the rebar is placed then the plumbing will need to be installed. After this, the gunite will be sprayed and once the concrete has been set then it will need to dry for approximately four weeks. This will be the longest part of the process, but it is critical that it dries for the appropriate amount of time so it can reach its required hydration and designed compression strength.

Final Steps and Fill

Once the gunite has cured, then the process can be finished and the pool can be filled. Prior to filling the pool with water, you may need to have tile installed along the top 6 inches or so of the pool. You may also have planned for the pool to be surrounded by beautiful pavers, to give you a serene place to sit and relax when you are not swimming. This is when those pavers would be put into place.

Start to Finish

It is important to start the process of your pool installation several months in advance due to the fact that it can take several weeks without any complications. There is always the chance that permits may take longer or the weather may hold up installation so the sooner you begin the process, the better chance you will have to have your pool completely installed by next summer.